Building the Education Revolution (BER)

Building the Education Revolution (Economic Stimulus Package), Sydney North Region with the Managing Contractor Bovis Lend Lease. FMB Architects completed the design and documentation of 33 school buildings in a period of nine (9) months.

The timing for the delivery of the buildings meant that the design and documentation was completed within an extremely challenging programme. Typically, a building would be delivered within nine (9) months from the initial meeting with the School Principal.

Bovis Lend Lease also entrusted FMB Architects with a large number of bespoke designs when the standard template design was not suitable.

 